1 Ferrari.JPG

Parking Overview:

· Eight ( 8 ) upper levels with a parking capacity of seventeen (17) cars per level total of 136.
· Seven (7) basement levels with a parking capacity of twenty five (25) cars per level total of 175.
· Ground level (entry/exit) has a management office 12m/sq and cashiers office 5m/sq as well as 14 parking spaces.
· Total Parking Capacity: 325 spaces.
· All floors lighting are activated by sensors.
· Ninth (9th) floor approx 280sq/m reserved for office space.
· Roof terrace approx 280sq/m has been requested for rental (20sq/m) for installation of GSM antenna.
· Car wash has been allocated 60sq/m on the –1 level. Approval has been granted.
· Two (2) Kleeman car elevators max/speed 0.65m/sec powered by electric motors with inverters.
· One (1) Kleeman passenger elevator max/speed 1.2m/sec powered by electric motor with inverter.
· Operating and control system of parking Developed and installed byScheidt-Bachmann , Germany . Serviced by SCAN S.A, Greece .

Price on request.